A Green Star upfront carbon assessment is a quantity take-off with a carbon factor applied. The factor comes from the database. The quantity has to be measured. We measure it.

When you need it

The right moment.

  • When a Green Star Buildings submission needs an upfront carbon assessment.
  • When the project team wants a third-party measure rather than the builder's own figures.
  • When the design changes and the carbon assessment has to move with it.
  • When the as-built quantities must be confirmed for the final submission.
What you get

The deliverable.

  • Detailed quantities for structure, envelope, services, architectural elements, finishes and fit-out.
  • Entered into the Green Star carbon template, by element and material, ready for the assessor.
  • A measurement report stating method, sources and assumptions, so the figures can be audited.
  • Design-stage and as-built measures, reconciled so the change is visible.
  • Coordination with the sustainability consultant and the builder's team.
Why the measure matters

The factor is public.
The quantity is yours.

Two projects can use the same carbon database and reach different answers. The difference is the measure. A take-off that misses the services, understates the concrete or double counts the façade gives a carbon figure that will not survive review.

Step 1ScopeAgree which elements and life-cycle stages the assessment covers, to the Green Star Buildings method.
Step 2MeasureQuantify every element from the drawings and models, by material, in the units the template needs.
Step 3ReconcileCheck the quantities against the cost plan and the contractor's procurement so nothing is missing or doubled.
Step 4TemplateEnter the quantities into the Green Star carbon template with a note on every source and assumption.
Step 5As builtUpdate the measure at completion so the final submission reflects what was built.
Why Trugo

Priced by people who have built.

Measurement is what quantity surveyors do. A carbon assessment is only a new use for it. We have measured the Green Star assessment on The Raleigh, a residential tower in Windsor, and are now doing the same on 68 Green Street, a commercial office in Cremorne. Both briefs cover structure, services, finishes and fit-out.

Because we also price buildings, our measure reconciles to the cost plan. That catches gaps a carbon-only measure would miss.

Related work

From the file.

The Raleigh, Windsor
Residential · Green Star measurement

The Raleigh, Windsor

Location
Windsor
Client
Maxcon Constructions, for the Green Star submission
Service
Green Star measurement

Third-party quantity measure for the Green Star upfront carbon assessment: structure, services, architectural elements, finishes and fit-out, measured as built and entered into the Green Star carbon template.

Measure complete. The same brief is now under way on 68 Green Street, a commercial office in Cremorne. The carbon calculation is only as good as the measure behind it.

Questions

Asked often.

Who commissions the measure?

Usually the builder or developer, on behalf of the Green Star submission. The sustainability consultant applies the carbon factors; we supply the quantities.

What do you need to start?

The current drawings and specification, the Green Star scope agreed with the sustainability consultant, and the carbon template the submission will use.

Do you measure for other rating tools?

The method is the same for any embodied carbon assessment. Ask about your tool.

Start the conversation

Every project starts with honest numbers.

No obligation and no sales process. A direct conversation about what your project needs and what it will cost.

Call SteveEnquire