Estimating
management.
More than thirty years running estimating departments for Tier 1, 2 and 3 contractors. We bring that to builders who need senior estimating capacity, and to owners who want their estimate built the way a contractor would build it.
The right moment.
- When a tender lands and the estimating team is already full.
- When a bid needs a senior estimator's judgement on risk, margin and method.
- When trade measures or bills of quantities are needed fast, to a standard tenderers trust.
- When an owner wants a cost plan priced from first principles, not from a rate table.
- When the estimating function itself needs a review: process, software, win rate.
The deliverable.
- Tender estimates built from first principles: labour, materials, plant, subcontract quotes and margin.
- Trade measures and bills of quantities in Cubit, structured to the tender.
- Early contractor involvement (ECI) cost plans for design and construct bids.
- Tender submission support: pricing schedules, clarifications and best-and-final offers.
- Estimating department review: process, templates, rates library and software.
From $100k
to $100M.
A pavilion refurbishment gets the same care as an $85M school. The method is the same. Only the number of trades changes.
Priced by people who have built.
Most quantity surveyors have only ever priced from the client side. The Director ran estimating for contractors including Hutchinson Builders, Walton and Cockram, in Australia and overseas. He has priced, won and lost tenders. That is the difference between knowing what a building should cost and knowing what a builder will charge for it.
Builders use us because we work the way their own estimators do, and because we are there when a tender arrives and the team is full.
Asked often.
Do you work for builders and owners on the same project?
No. Where we are engaged by a builder on a tender, we will not act for the owner on that project, and the reverse.
What software do you use?
Cubit for measurement and Cubit Select for pricing. We work in the builder's templates when asked.
How quickly can you turn a tender around?
It depends on the documents. Small works in a few days; a full trade measure on a major project in two to three weeks. We agree the program before we start.
Is this only for builders?
No. Owners, developers and project managers use the same first-principles method to test a builder's price or to set a budget that reflects how the work will really be bought.
Full spectrum cost management.
Cost Planning
Elemental cost plans at each design stage, so the budget keeps pace with the drawings.
Read moreFeasibility Studies
Find out whether the numbers work before you buy the site or brief the architect.
Read moreBills of Quantities & Tenders
Measured documents that make every tenderer price the same work. Then a clear tender recommendation.
Read moreVariations & Progress Claims
Every claim and every variation checked, so you pay a fair price and no more.
Read moreBank Reporting
Independent cost reports and drawdown certificates that lenders can rely on.
Read moreInsurance & Reinstatement
Reinstatement valuations and claim quantification that hold up with insurers and loss adjusters.
Read moreGreen Star & Upfront Carbon
Third-party quantity measurement for Green Star submissions and upfront carbon assessments.
Read moreExpert Witness
Independent quantum evidence for courts, VCAT and arbitration.
Read more