Services · Cost planning

Cost
planning.

A cost plan tells you what a building will cost before you are committed to it. We prepare elemental cost plans at each design stage, so the budget keeps pace with the drawings instead of chasing them.

When you need it

The right moment.

  • Before a funding application, a grant submission or a board or council approval.
  • At each design milestone, from concept to design development.
  • When the design and the budget have drifted apart and someone needs to say so.
  • Before you go to tender, so you know what a fair price looks like.
What you get

The deliverable.

  • An elemental cost plan set out in the format of the AIQS Australian Cost Management Manual.
  • Rates per square metre of gross floor area, compared against similar projects.
  • Contingency and escalation shown separately, with the reasoning stated.
  • Inclusions, exclusions and assumptions listed plainly, so nobody is surprised later.
  • A covering letter in plain language for your board, council or client.
Stage by stage

The budget moves
with the drawings.

A cost plan is not a single number. It is updated at each design stage, and the range narrows as the design firms up.

Stage 1ConceptArea-based estimate from the brief and massing. Sets the budget envelope.
Stage 2Schematic designElemental cost plan. Tests the design against the budget, element by element.
Stage 3Design developmentDetailed measure of the main elements. Value management where the budget is tight.
Stage 4Pre-tender estimatePriced from the tender documents. The benchmark the tenders are judged against.
Stage 5Tender evaluationTenders normalised, clarified and compared. A written recommendation.
Why Trugo

Priced by people who have built.

Most cost plans are built from benchmarks. Ours start from how the work is actually priced: labour, materials, plant and a builder's margin. The Director spent more than thirty years pricing work for contractors in Australia, the UK, Ireland, Hong Kong and Greece. He knows where estimates go wrong.

We work to the design program and we put turnaround in writing. On a recent council community hub we committed to ten business days for the opinion of probable cost, ten for the elemental cost plan, eight for the pre-tender estimate and fifteen for the bill of quantities. Those are commitments, not targets.

Related work

From the file.

Wellways Services Hub
Community · Tender advice & client QS

Wellways Services Hub

Value
$5.5M
Client
Wellways (not-for-profit)
Service
Tender advice & client QS

Pre-tender cost plan, then financial lead on the Tender Advisory Panel: eight tenders screened, clarified, financially checked and taken through best-and-final offers and value management. Now client QS through construction.

The three leading tenders came in within 5% of our cost plan. The preferred tender was 2.2% above it. The Board approved the recommendation.

Ivanhoe Aquatic Centre pool hall
Aquatic & leisure · Procurement advice

Ivanhoe Aquatic Centre

Location
Ivanhoe
Client
Banyule City Council
Service
Staging & procurement advice

Staging advice to Council on the centre's redevelopment, testing a single-stage build against early gym handover and a live site that keeps the existing gym trading.

Each option set out on programme, staging premium, tender market and contract form, with Council's revenue case tested against the cost of keeping part of the centre open. Council could set direction before design fixed the answer.

Questions

Asked often.

What is the difference between an estimate and a cost plan?

An estimate is a single price at a point in time. A cost plan breaks the budget into building elements, such as substructure, frame, roof and services, so you can see where the money goes and track it as the design changes.

How accurate is a concept cost plan?

At concept stage the range is wide, often 15 to 20 per cent either way, because much of the building is not yet designed. The range narrows at each stage. We state the range and the main risks in every report.

What do you need from us to start?

Whatever drawings and brief exist, the site address, and the program. An area schedule is enough for a concept estimate.

Can you work for the architect or project manager rather than the owner?

Yes. Much of our cost planning is engaged through architects and project managers. We report to whoever engages us and keep the client's interest in view.

Start the conversation

Every project starts with honest numbers.

No obligation and no sales process. A direct conversation about what your project needs and what it will cost.

Call SteveEnquire